Building the New Kennel
![]() This is what we had after one day of work. |
![]() At the end of week two, the trusses were up and the plumbing was being roughed in. |
![]() |
Three weeks into the project, and we were still framing. But the plumbing was roughed in and the dirt floor was graded. |
![]() |
| Here
you can see the roof is on, the concrete floor was poured, the exterior framing was done and the doors and windows are in. |
![]() |
![]() |
| Now
it looks like a real building! Note the framing for the indoor/outdoor dog run doors--they're on both sides. |
| The utilities are
in! And the building looks so much nicer with the green trim,
doesn't it? On the inside the construction of walls has started, too. Not bad for just under two months! |
![]() |
![]() |
| Here
you can see the interior is being framed and the heating system is being installed at the two month mark. |
![]() |
|
Well,
it turns out we WERE able to build the kitchen along |